Space Travel News  
Global Hawk Passes Fuel Test

The main parameter for testing was weight, he said. The testers initially weighed the aircraft to determine its gross weight. The team then weighed the aircraft again as it began to show signs of starvation, Captain Leggiero said. This was to measure the amount of fuel in the tank when fuel starvation began.
by Staff Writers
Edward AFB CA (SPX) Oct 23, 2007
The 452nd Flight Test Squadron pushed the RQ-4 Global Hawk Block 20 to its fuel system limits during a weeklong starvation test here in October. The testing involved tilting the aircraft to a 20-degree angle while running the aircraft out of fuel inside the weight and balance hangar. "The testing is very important," said Lt. Col. Andy Thurling, 452nd FLTS commander. "It allows us to know the aircraft's fuel requirements in case of a missed landing. This will allow for longer flights and more efficiency in the air."

The Block 20 carries 1,000 pounds more payload and 6,000 pounds more fuel than the Block 10, said Capt. Stephen Leggiero, 773rd Test Squadron project engineer. Because of the increase in weight, additional fuel is required for the aircraft. This means an entirely new fuel cell configuration and fuel management system was necessary.

Aside from the starvation testing, the team performed a weight and balance test on the aircraft to determine how changes in fuel weight change the aircraft's center of gravity.

During the test, the Global Hawk was weighed then placed on blocks to allow additional ground clearance for the tail of the aircraft.

After preparation, the team fired up the engines and began to tilt the aircraft.

"We tilted the aircraft at the high 20-degree angle to simulate a go-around situation," said 2nd Lt. Garrison Lindholm, 773rd TS subsystem engineer.

A go-around is where the aircraft misses an approach and is required to climb at a steeper attitude, he said.

"We wanted to ensure that at the steep deck angle, the pumps would not create an engine flame out resulting in engine failure," Lieutenant Lindholm said.

The main parameter for testing was weight, he said. The testers initially weighed the aircraft to determine its gross weight.

The team then weighed the aircraft again as it began to show signs of starvation, Captain Leggiero said. This was to measure the amount of fuel in the tank when fuel starvation began.

During the testing, the team used a synthetic fuel called Isopar-M instead of standard JP-8 fuel for safety purposes. The JP-8 has a lower flash point, which is the point where fuel ignites.

"Overall, the testing went very smoothly," Captain Leggiero said. "It really highlights some of the fantastic infrastructure we have on base, and the wonderful people who pulled together to make things happen."

Related Links
UAV News - Suppliers and Technology



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


BAE Systems Led UCAV Programme Breaks New Ground
Warton, UK (SPX) Oct 17, 2007
The cutting of first metal for the UK's 124m Taranis UCAV (unmanned combat air vehicle) technology demonstrator programme means that the BAE Systems led team remains well on track for first flight in 2010. In addition to the physical manufacture of the Taranis airframe now being underway, the design of the autonomous systems have also been finalised.







  • Jules Verne Dry Cargo Prepared In Turin
  • J-2X Powerpack Test Article Installed On Test Stand
  • Dawn Of A Long Voyage To The Beginning Of Sol And Beyond
  • Kennedy Prepares To Host Constellation Launch Vehicle

  • ILS Proton Launch Scheduled In November For SES SIRIUS 4 Satellite
  • Successful Ariane 5 Upper Stage Engine Re-Ignition Experiment
  • United Launch Alliance Managed Delta 2 Launches New GPS For US Air Force
  • ATK Propulsion And Composite Technologies Help Launch GPS Satellite

  • Space Shuttle Discovery Is Ready; Weather Remains A Concern
  • Former USAF Pilot Second Woman To Command Shuttle
  • Discovery mission key to International Space Station construction
  • NASA Assigns Crew For Final Solar Array Delivery To Station

  • Columbus Hatch Closed For Last Time
  • Expedition 15 Set To Return Home
  • Soyuz Docks With ISS
  • SpaceX Completes NASA CDR For New Dragon

  • Soyuz Returns Once Again
  • Broccoli Sprout-Derived Extract Protects Against Ultraviolet Radiation
  • Malaysia cheers historic space odyssey
  • First Stop Moon. Next Stop, Mars

  • China plans to launch first moon orbiter on Wednesday
  • China reveals space plans
  • China Plans Ambitious Space Program Over Decade Ahead
  • Nation Hopes To Cooperate In Space

  • QinetiQ Establishes Service And Support Centre For Talon Robots In Australia
  • UCSD Researchers Give Computers Common Sense
  • Japan's robot industry forecasts strong growth
  • Robotic Rockhounds: Interview with David Wettergreen Part 2

  • UA's Phoenix Mars Mission Gets A Chance To Lounge
  • Hawaii Reveals Steamy Martian Underground
  • Hummocky And Shallow Maunder Crater
  • NASA extends Mars probes' mission for 5th time

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement