Space Travel News  
Astrium Wins Study For New Vega Upper Stage

Artist's impression of Vega at the launch pad.
by Staff Writers
Bremen, Germany (SPX) Jul 26, 2007
Astrium has won a contract from the German Aerospace Center (DLR) in Cologne to investigate concepts for a new upper stage for the European launcher Vega. The project is named "Venus" (Vega New Upper Stage). Currently under development, Vega is a small European launch vehicle which is scheduled for first launch in 2009. The study now awarded to Astrium is worth roughly half a million euros and will run for a period of 18 months.

"This study holds tremendous potential for Astrium in Bremen. It could lead to us developing and building the upper stages of every future European launcher. We will be using our extensive expertise built up on Ariane as we progress the study - which should establish our reputation as the specialist for upper stages in Germany and across Europe," said Gunter Stamerjohanns, Astrium's head of launcher systems in Germany at the contract signing in Bremen. The upper stage currently envisaged for Vega, which is designed to carry payloads of up to 1.5 metric tons, will have a Russian/Ukrainian propulsion system.

"Germany supports independent European access to space. This independent access is becoming increasingly important with respect to small launch vehicles, given the declining availability and rising launch prices for converted Russian ex-military launchers," explained Dr Claus Lippert, head of space transportation at the DLR.

The Vega rocket is being developed by the Italian Space Agency (ASI) under contract to the European Space Agency ESA. Germany has not participated in the programme so far. However, if the expected increase in transport requirements for European miniature satellites and the greater risk due to Europe's dependency on Russian launch services should lead to a decision to place more emphasis on 'Europeanising' Vega and enhancing its performance, it could become necessary for Germany to participate in the programme as a specialist for upper stages.

Dr Lippert continued: "In preparation for a possible decision of this nature, we tasked Astrium with investigating various technical concepts under the Venus project." A decision as to whether or not Germany should participate in any further development of Vega, and in what form, could then be made in 2008 on the basis of these findings. The area is being investigated in close consultation with ESA and ASI, and is likely to feature on the agenda of the ESA countries' next ministerial conference at the end of 2008, according to Dr Lippert.

Related Links
Astrium
Rocket Science News at Space-Travel.Com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


ATK Wins Another Orion Launch Abort Subsystem Contract
Minneapolis MN (SPX) Jul 24, 2007
Alliant Techsystems has been selected by Orbital Sciences as part of the Orion prime contractor team, led by Lockheed Martin, to provide the attitude control motor (ACM) for NASA's Orion crew exploration vehicle launch abort system (LAS). The new LAS contract is valued at approximately $70 million. The ACM adds to ATK's content on the LAS, which already includes the primary launch abort motor. Work on the ACM will be performed at ATK facilities in Elkton, MD.







  • Astrium Wins Study For New Vega Upper Stage
  • ATK Wins Another Orion Launch Abort Subsystem Contract
  • Old Space Prepares To Buy New Space As Northrop Scoops Up Scaled Composites
  • Pratt And Whitney Rocketdyne Awarded NASA Contract For J-2X Ares Rocket Engine

  • Spaceway 3 Is Delivered To The Spaceport For Its Mid-August Ariane 5 Launch
  • Russian Space Firm Signs 14 Deals For Commercial Rocket Launches
  • Sea Launch To Resume Zenit Launches In October
  • Russia Proton-M Booster Puts US Satellite Into Orbit

  • External Tank ET-120 Headed to Kennedy Space Center
  • Flight Readiness Review Gets Under Way
  • STS-118 Crew Completes Countdown Rehearsal
  • Space Shuttle Endeavour Moved To Launch Pad

  • 2006-2007 International Space Station Science: Looking Back and Ahead...
  • ISS Orbit Adjusted To Host Shuttle Endeavor
  • Station Crew Completes Successful Spacewalk
  • New NASA System Will Help Space Station Crews Breathe Easier

  • NASA Announces Next Undersea Exploration Mission Dates And Crew
  • Congress Examines Challenges Facing Shuttle And Station Programs
  • Space Adventures Secures Seats On The Soyuz
  • Washington Conference To Examine Impact Of Civilian Space Travel On Culture And Economy

  • Chinese Astronauts Begin Training For Spacewalk
  • China Prepares To Select New Taikonauts
  • Dongfanghong 4 Ready For More International Satellite Orders
  • China To Launch Third Sino-Brazilian Satellite In September

  • Robotic Ankle For Amputees Is Developed
  • iRobot Receives New Military Orders 14 PackBot Robots
  • New Japanese Humanoid Invites Grown-Ups To Play
  • Robots Incorporated

  • Search For Life In Martian Ice Relies On UK Technology
  • Creating Martian Clay
  • Digging Deep For Martian Life
  • Opportunity Calls Home After Some Solar Juice Cranks Up The Batteries

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement