Space Travel News  
Stardust Responds On First Command From Earth

illustration only
by Allan Cheuvront
Stardust Flight Director
Pasadena CA (JPL) Feb 07, 2007
It has been nearly a year since Stardust successfully released the capsule that returned the Wild 2 dust particles to earth and sent its last signal before being placed in a hibernation state. That situation changed when the Spacecraft Team (SCT) recently radiated commands to have STARDUST resume communications in order to determine the spacecraft's health for a follow-on mission to the comet Tempel 1.

As usual, the reliable spacecraft responded to our commands and the signal was received at the expected time. There was concern that a large solar flare last December could have placed the spacecraft in an unknown state.

The first telemetry indicated a processor reboot had occurred but the spacecraft's subsystems were in excellent condition. After restoring communication, the remainder of the Deep Space Network (DSN) pass was used to obtain the history data for the last year.

After saying "bon voyage" on January 29, 2006, the spacecraft passed through its perihelion (0.92 AU), the closest approach to the sun for the spacecraft, and made it safely through.

On July 10, 2006, a spontaneous reboot of the processor occurred. The cause of the reboot is unknown but was probably due to solar/space interference. The spacecraft returned itself to its safe mode state and continued

The spacecraft returned itself to its safe mode state and continued cruising. On December 7, 2006, another large solar flare created problems for the Star Camera.

After struggling for several hours to obtain good star images, an attitude control error caused the spacecraft to re-enter safe mode. Once again the spacecraft returned to its nominal safe mode state where it remained until contacted last Monday.

Our second DSN pass was used to clear the reboot counters, exit safe mode and ready the spacecraft for the instrument checkout scheduled. We will check out the health of the instrument suite including, Dust Flux Monitor (DFM), Cometary Interstellar Dust Analyzer (CIDA) and Navigation Camera (NAVCAM).

The playback of the science instruments will take the remaining DSN passes through early February. After all the recorded data has been received on the ground we will again command the spacecraft into its safe mode or hibernation state. The spacecraft will remain in hibernation until the final decision is made concerning the Stardust-NExT follow-on mission.

The Stardust-NExT (New Exploration of Tempel) mission would encounter the comet Tempel 1 in 2011 and image the crater made by the Deep Impact mission. The program is currently developing a Concept Study Report that provides additional information about the proposed follow-on mission. The final decision is expected in the May/June timeframe.

Related Links
Stardust at JPL
Stellar Chemistry, The Universe And All Within It



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Iran May Be Ready To Attempt First Satellite Launch
Washington (AFP) Jan 25, 2007
Iran is poised to launch a satellite into space, a step that could herald a new dimension in Tehran's strategic capabilities, Aviation Week and Space Technology said Thursday on its website. A recently assembled, 30-ton ballistic missile-turned space launcher could also be used for testing longer-range missile strike technologies, according to the report which the weekly magazine said would appear in its January 29 issue.







  • SpaceDev Conducts Hot-Fire Test Of Hybrid Upper Stage Rocket Motor
  • Lockheed Martin Readies For Orion Crew Exploration Vehicle At Kennedy Space Center
  • Test Flights Of Angara Boosters To Start In 2010
  • Researchers Create New Class Of Compounds

  • Sea Launch Zenit Explodes On Pad
  • Sea Launch Operations To Be Resumed Despite Liftoff Failure
  • SpaceWorks Engineering Releases Study On Emerging Commercial Transport Services To ISS
  • JOULE II Launches With Success At Poker Flat

  • Space Shuttle Launch Rescheduled

  • ISS Crew Conduct Back To Back Spacewalks Over Several Days
  • Activity Filled Schedule Keeps Astronauts Busy On Space Station
  • Astronauts For Shuttle Japanese Experiment Module Kibo Mission Assigned
  • US Astronauts To Conduct Three Spacewalks By February 8

  • NASA Sets Out Tough Training To Reach For The Stars
  • Space Commercialization Contracts Signed
  • US Astronaut Faces Attempted Murder Charge In Love Triangle Case
  • A Spaceship For Sale On Ebay May Win Half A Million Dollars

  • Baker's Dozen Via For Chinese Lunar Rover Design
  • China Holds Firm On Space Test As US Reviews Options
  • China To Launch New Series Of Oceanic Survey Satellites
  • Japan's Abe Charges China Satellite Test Illegal

  • Scientists Study Adhesive Capabilities Of Geckos To Develop Surveillance Or Inspection Robots
  • Japanese Women To Try Lipstick With Touch Of Button
  • First Soft-Bodied Robots Planned
  • Singapore Launches Contest To Build 'Urban Warrior' Robots

  • Mars Express Camera Now In Its Third Year
  • Spirit Examines Churned-Up Martian Soil
  • Looking For Microbial Martians
  • Opportunity Making Its Way To Final Position On Cape Desire

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement