Space Travel News  
PSE Announces Plan To Expand Wild Horse Wind Facility

The Wild Horse Wind Facility.
by Staff Writers
Bellevue WA (SPX) Apr 21, 2008
Puget Sound Energy has announced plans to expand its Wild Horse Wind Facility, located east of Ellensburg on Central Washington's Whisky Dick Mountain. PSE is proposing to add approximately 25 wind turbines to its Wild Horse operations in eastern Kittitas County, which currently has 127 turbines. The expansion would add a 1,400-acre parcel of land immediately to the north of the existing 9,150-acre site.

The permanent footprint of new turbines, roads, and support facilities will be approximately 2-3 percent of the total site area. PSE purchased the undeveloped land in February 2008.

At maximum output, the Wild Horse facility currently generates up to 229 megawatts (MW) of electricity-enough power to serve approximately 60,000 households. The expansion project will boost Wild Horse generating capacity by a projected 40 to 50 MW. The proposed expansion remains within the maximum number of turbines (158) and power output (312 MW) authorized by Wild Horse's original development permits.

"The Wild Horse site has proven itself to be an excellent location for producing clean, renewable energy, and it makes sense to build on that success," said Kimberly Harris, executive vice president and chief resource officer for PSE. "This expansion is a logical step for the local community and the environment."

Harris said PSE will ask the state Energy Facility Site Evaluation Council to amend the utility's current Wild Horse site certification agreement to accommodate the expansion project. PSE will also be pursuing an amendment to its existing Wild Horse development agreement with Kittitas County.

PSE will seek public input before filing permit applications for the expansion. An open house is scheduled for 4:30 to 7 p.m., April 30, Manastash Room, Kittitas Valley Events Center, so that the community can learn more about the proposed expansion.

PSE anticipates that once the necessary approvals are received, construction will begin in 2009 with the new Wild Horse turbines producing electricity by 2010. As with the initial construction at Wild Horse, PSE will work to minimize development impacts on the environment, including wildlife and the area's distinctive shrub-steppe habitat of cactus and sagebrush. PSE and the Wild Horse project played a key role in the preservation of approximately 17,000 acres of shrub-steppe habitat surrounding the project.

In addition to the wind turbines, the Wild Horse site also includes a 500-kilowatt solar project, the Pacific Northwest's largest solar energy producer, and the recently opened Renewable Energy Center, where the public can learn more about wind and solar power as well as the natural history of the Kittitas Valley.

Wild Horse, together with PSE's Hopkins Ridge Wind Facility near Dayton in southeast Washington, produces enough electricity, on average, to serve approximately 100,000 households.

Kittitas County has prospered from the wind farm since its completion in late 2006. The facility created more than 20 permanent jobs, generates more than $1.3 million in new tax dollars annually for local schools and county services, and spurred additional investment in local businesses and infrastructure.

PSE expects the expansion project to increase those long-term benefits by about 15 percent. In addition, construction of the new turbines and support infrastructure will create a large number of temporary jobs; the project labor force peaked at about 250 during Wild Horse's 2006 construction.

Related Links
Puget Sound Energy
Powering The World in the 21st Century at Energy-Daily.com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


EDF Energies Nouvelles Is Set To Launch Construction Of A 150 MW Wind Farm
Paris, France (SPX) Apr 18, 2008
enXco, EDF Energies Nouvelles' US subsidiary, has obtained a permit from the authorities of the Solano County, California, to build a 150 MW wind farm. This new large-scale wind farm, owned by enXco, will strengthen EDF Energies Nouvelles Group's already strong presence in California. Located in Solano County, California, the Shiloh II project will be comprised of 75 turbines, each with 2 MW in capacity, supplied by German manufacturer REpower.







  • Rocket Mystery Explained With New Imaging Technique
  • NASA Awards Contract For Engine Technology Development
  • SpaceX Conducts First Three-Engine Firing Of Falcon 9 Rocket
  • European Space Truck Jules Verne In Parking Orbit

  • Ariane 5 rocket lifts Brazilian, Vietnamese satellites into space
  • Orbital Awarded USAF Contract For Three Minotaur Space Launch Vehicles
  • Its A Go For Arianespace's Second Ariane 5 Mission Of 2008
  • C/NOFS Satellite Built By General Dynamics Successfully Launched From Reagan Test Site

  • Hope Takes Flight On Shuttle Discovery
  • NASA reschedules shuttle launch date
  • Shuttle Endeavour returns after record-setting mission to ISS
  • Endeavour Crew Prepares For Landing

  • Expedition 16's Whitson Hands Over Command Of Station
  • NASA Awards Space Station Water Contract To Hamilton Sundstrand
  • Russia Needs Billions More To Complete It's ISS Segment
  • Russia to call for extending ISS use

  • Russian Space Capsule Lands 260 Miles Away From Target Site
  • Indian Government Actively Considering Sending Man Into Space
  • Electric Sail Invention Approaches Implementation
  • Roskosmos supports space tourism

  • China Launches New Space Tracking Ship To Serve Shenzhou VII
  • Three Rocketeers For Shenzhou
  • China's space development can pose military threat: Japan
  • Cassini Tastes Organic Material At Saturn's Geyser Moon

  • Canada rejects sale of space firm to US defense firm
  • The Future Of Robotic Warfare Part Two
  • Robot anaesthetist developed in France: doctor
  • Surgeons use robots during heart surgery

  • Mars Radar Opens Up A Planet's Third Dimension
  • Russia Continues Flight Simulation Experiments For Mars-500
  • Missions To Mars
  • NASA Spacecraft Fine Tunes Course For Mars Landing

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement