Space Travel News  
NASA Readies Mars Lander For August Launch To Icy Site

File image of Phoenix engineering test model undergoing testing in Death Valley California.
by Staff Writers
Washington DC (SPX) Jul 10, 2007
NASA's next Mars mission will look beneath a frigid arctic landscape for conditions favorable to past or present life. Instead of roving to hills or craters, NASA's Phoenix Mars Lander will claw down into the icy soil of the Red Planet's northern plains. The robot will investigate whether frozen water near the Martian surface might periodically melt enough to sustain a livable environment for microbes. To accomplish that and other key goals, Phoenix will carry a set of advanced research tools never before used on Mars.

First, however, it must launch from Florida during a three-week period beginning Aug. 3, then survive a risky descent and landing on Mars next spring.

"Our 'follow the water' strategy for exploring Mars has yielded a string of dramatic discoveries in recent years about the history of water on a planet where similarities with Earth were much greater in the past than they are today," said Doug McCuistion, director of the Mars Exploration Program at NASA Headquarters, Washington. "Phoenix will complement our strategic exploration of Mars by being our first attempt to actually touch and analyze Martian water -- water in the form of buried ice."

NASA's Mars Odyssey orbiter found evidence in 2002 to support theories that large areas of Mars, including the arctic plains, have water ice within an arm's reach of the surface.

"Phoenix has been designed to examine the history of the ice by measuring how liquid water has modified the chemistry and mineralogy of the soil," said Peter Smith, the Phoenix principal investigator at the University of Arizona, Tucson.

"In addition, our instruments can assess whether this polar environment is a habitable zone for primitive microbes. To complete the scientific characterization of the site, Phoenix will monitor polar weather and the interaction of the atmosphere with the surface."

With its flanking solar panels unfurled, the lander is about 18 feet wide and 5 feet long. A robotic arm 7.7 feet long will dig to the icy layer, which is expected to lie within a few inches of the surface. A camera and conductivity probe on the arm will examine soil and any ice there. The arm will lift samples to two instruments on the lander's deck. One will use heating to check for volatile substances, such as water and carbon-based chemicals that are essential building blocks for life. The other will analyze the chemistry of the soil.

A meteorology station, with a laser for assessing water and dust in the atmosphere, will monitor weather throughout the planned three-month mission during Martian spring and summer. The robot's toolkit also includes a mast-mounted stereo camera to survey the landing site, a descent camera to see the site in broader context and two microscopes.

For the final stage of landing, Phoenix is equipped with a pulsed thruster method of deceleration. The system uses an ultra-lightweight landing system that allows the spacecraft to carry a heavier scientific payload. Like past Mars missions, Phoenix uses a heat shield to slow its high-speed entry, followed by a supersonic parachute that further reduces its speed to about 135 mph. The lander then separates from the parachute and fires pulsed descent rocket engines to slow to about 5.5 mph before landing on its three legs.

"Landing safely on Mars is difficult no matter what method you use," said Barry Goldstein, the project manager for Phoenix at NASA's Jet Propulsion Laboratory, Pasadena, Calif. "Our team has been testing the system relentlessly since 2003 to identify and address whatever vulnerabilities may exist."

Researchers evaluating possible landing sites have used observations from Mars orbiters to find the safest places where the mission's goals can be met. The leading candidate site is a broad valley with few boulders at a latitude equivalent to northern Alaska.

Smith leads the Phoenix mission, with project management at the Jet Propulsion Laboratory and the development partnership located at Lockheed Martin, Denver. International contributions are provided by the Canadian Space Agency, the University of Neuchatel, Switzerland, the University of Copenhagen, Denmark, the Max Planck Institute, Germany, and the Finnish Meteorological Institute.

Related Links
Phoenix at NASA
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


One Image Planned During Descent Of Phoenix
Pasadena CA (JPL) Jul 06, 2007
Extensive testing of NASA's Phoenix Mars Lander in preparation for an August launch has uncovered a potential data-handling problem in time to modify plans for use of a camera during the final minutes of arrival at Mars. The testing results led to a decision to take just one photograph with the spacecraft's Mars Descent Imager. The mission will still be capable of accomplishing all of its science goals. The issue is not the camera itself, which is capable of taking multiple downward-looking images of the landing area during the final three minutes of flight.







  • NASA Selects Alcoa As Materials Supplier For Ares 1 Launch Vehicle
  • Aerojet Demonstrates Key Advances In Controllable Solid Propulsion Rocket Motors
  • Development Contracts Signed For Future European Launchers
  • DARPA And Australia Collaborate On Successful Hypersonic Flight Test

  • Russia Proton-M Booster Puts US Satellite Into Orbit
  • From Under The Sea And Into Space
  • China Launches Thales-built Chinasat 6B Telecommunication Satellite
  • Boeing Lockheed Rocketeers Turn To SAP For Bettter ERP

  • Shuttle Endeavour To Move To Pad Crew Ready For Countdown Test
  • NASA Gives Green Light For Space Shuttle Flight
  • Ferry-Flight Will Return Atlantis To Kennedy
  • Shuttle Endeavour Set For Move To Vehicle Assembly Building

  • Station Computer Inspection Continues
  • International Space Station Provides Classroom for Students Around the World
  • Senate Committee Chairs React To NASA Report On ISS National Laboratory
  • Station And Shuttle Crews Close Hatches And Prep For Undocking Tuesday

  • First Malaysian Astronaut To Take Off For Space Station October 10
  • Wyle To Prepare First Passengers For Virgin Galactic Maiden Spaceflight
  • Russia Launches Genesis 2 On Converted SS-18 ICBM Launcher
  • NASA Selects Reynolds To Design Emergency Egress System For Orion Astronauts

  • China To Launch Third Sino-Brazilian Satellite In September
  • China Launches Satellite To Take TV Signal Nationwide
  • China Launches Communications Satellite SinoSat-3
  • China Aims To Launch Moon Probe This Year

  • Lockheed Martin Reaches Major Milestone For The Mule Robotic Vehicle Engineering Evaluation Unit
  • Eurobot Makes A Splash
  • Team SpelBots Take On Robotic Titans At RoboCup 2007
  • Japanese Humanoid Is Working In The Rain

  • NASA Readies Mars Lander For August Launch To Icy Site
  • Spirit Independently Approaches And Studies A Rock
  • Scientists Find That Earth And Mars Are Different To The Core
  • Martian Tectonic Signatures At Aeolis Mensae

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement