Space Travel News  
Inauguration Of The Galileo Control Centre At DLR

The Galileo Control Centre at DLR's Oberpfaffenhofen site. By the time the Galileo satellite navigation system is fully operational, up to 100 engineers and scientists will be working here at over 30 control consoles. Credit: DLR.
by Staff Writers
Oberpfaffenhofen, Germany (SPX) Sep 17, 2008
On 8 September 2008, the new building complex for the Galileo Control Centre at the German Aerospace Center (Deutsches Zentrum fur Luft- und Raumfahrt; DLR) in Oberpfaffenhofen was formally handed over.

"For the staff of the new Galileo Control Centre, this marks the beginning of the actual preparation phase for the operation of the future European satellite navigation system Galileo", said Professor Johann-Dietrich Worner, Chairman of the DLR Executive Board.

Worner went on to say: "By operating the Galileo Control Centre, DLR shows how important its Oberpfaffenhofen site is and how significant science can be as an economic factor when it joins forces with political and other partners."

In a festive ceremony, the Berlin-based architectural firm "Schultes Frank Architekten" presented a symbolic key to DLR.

The importance of the Galileo project for Europe, Germany and Bavaria was underlined by the attendance of EU Commissioner for Transport Antonio Tajani, Prime Minister Gunther Beckstein of the Free State of Bavaria, as well as Bavarian State Minister Emilia Muller and Matthias von Randow, State Secretary of the German Federal Ministry of Transport, Building and Urban Affairs (Bundesministerium fur Verkehr, Bau und Stadtentwicklung).

The new control centre, with over 3000 square metres of floor space, was completed after just two years of building work. The fully-equipped building has cost about 100 million euro.

By the time the Galileo satellite navigation system is fully operational, up to 100 engineers and scientists will be working at over 30 control consoles in the control centre in Oberpfaffenhofen. A multinational team is responsible for preparing and operating Galileo.

Staff of the other European Galileo Control Centres will also be present in Oberpfaffenhofen so as to ensure close coordination and cooperation.

The Galileo Control Centre in Oberpfaffenhofen is part of the core ground segment. The satellites are controlled and mission data is received through a globally distributed ground station network.

The control centre in Oberpfaffenhofen is equipped with state-of-the-art infrastructure in order to meet the high demands made on the Galileo infrastructure and to ensure failure-free operation for the next 20 years.

Important navigational data as well as the reference time which is relevant for all Galileo applications are generated on the ground in the control centres and transmitted to the Galileo satellites via the ground stations.

Related Links
German Aerospace Center
GPS Applications, Technology and Suppliers



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


SSTL Completes Galileo In-Orbit Test Campaign
Guildford, UK (SPX) Sep 10, 2008
SSTL has completed an in-orbit test campaign analysing signals from the new GIOVE-B satellite for ESA. The results suggest that GIOVE-B is operating well and in turn validates technologies integral to the EU-funded Galileo Satellite Navigation project.







  • College Students Develop Rocket Motors In Tamil Nadu
  • US marks Ares milestone in next chapter of manned space flight
  • Pratt And Whitney Rocketdyne To Further Test J-2X
  • Russia Set To Test Second-Stage Booster For Angara Rocket

  • Sea Launch Prepares For The Launch Of Galaxy 19
  • New Impulse To Russian Rockets
  • ATK Propulsion And Composite Technologies Key To Successful Delta II Launch
  • United Launch Alliance Launches GeoEye-1 Commercial Satellite

  • Endeavour's move to launch pad set
  • NASA adjusts launch dates
  • Shuttle Atlantis At The Pad For Final Hubble Mission
  • Will NASA Retire The Space Shuttle In 2010

  • Hurricane Ike's impact felt at International Space Station: NASA
  • Russia To Launch Progress M-65 Space Freighter To ISS
  • Russia's Progress Spacecraft Buried In Pacific Ocean
  • European freighter detaches from space station

  • Building A New Rocket For The Nation
  • Actel Launches Flash-Based FPGAs Into Space
  • US astronaut promotes Mexican space agency
  • NASA's Ares I Rocket Passes Review To Reach Critical Milestone

  • Short Flight For Shenzhou 7
  • New Crews For Shenzhou
  • Shenzhou: A Spacewalk In The Sunlight
  • China To Launch Third Manned Space Flight Sep 25

  • iRobot Awarded US Army Contract For Robotic Systems
  • Robots Learn To Follow
  • Robot-assisted surgery repairs fistulas
  • Japanese Researchers Eye e-Skin For Robots

  • More Soil Delivered To Phoenix Lab
  • NASA Selects CU-Boulder To Lead Mars Mission
  • Opportunity Bids Farewell To Victoria
  • NASA Selects MAVEN Mission To Study Mars Atmosphere

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement