Space Travel News  
Boeing Submits Proposal For Altair Lunar Lander Study Contract

The Altair lunar lander is envisioned with two stages: The descent stage will house the majority of the fuel, power supplies, and breathing oxygen for the crew. The ascent stage will house the astronauts, life-support equipment, and fuel for the ascent stage motor and steering rockets.
by Staff Writers
Houston TX (SPX) Mar 03, 2009
Boeing, through its Space Exploration division, has submitted a proposal to NASA for Altair lunar lander design support. NASA is expected to award multiple contracts this spring.

The lunar lander, part of NASA's Constellation program, will launch aboard the Ares V heavy-lift rocket and provide astronauts with life support and a base for exploration missions. Altair will also return the crew to the Orion spacecraft that will transport the astronauts back to Earth.

The Altair Conceptual Design Contract calls for NASA-directed engineering tasks to support evaluation of conceptual designs, maturation of the vehicle design, and preparation of products for system-requirements and system-definition reviews.

"Boeing is uniquely positioned to provide great design support now, as well as to support Altair development, test and evaluation when the time comes," said Keith Reiley, lunar lander project manager for Boeing.

"Our ability to transition a skilled space shuttle work force ensures we can distribute the necessary expertise where it is needed as NASA transitions from the shuttle program to Constellation. We plan to support NASA with a local core team, enterprisewide specialty engineering experts, and a range of suppliers, including small and innovative high-tech companies."

The Altair lunar lander is envisioned with two stages: The descent stage will house the majority of the fuel, power supplies, and breathing oxygen for the crew. The ascent stage will house the astronauts, life-support equipment, and fuel for the ascent stage motor and steering rockets.

The lander will carry a crew of four and be able to stay on the moon for up to six months. Altair will be capable of landing with 15 to 17 metric tons of dedicated cargo. The first crewed flight is scheduled for 2020.

NASA issued its request for proposal on Jan. 28 and will manage the Altair Conceptual Design Contract out of Johnson Space Center in Houston.

Related Links
Boeing Integrated Defense Systems
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


China's Lunar Probe Chang'e-1 Impacts Moon
Beijing (XNA) Mar 02, 2009
Chang'e-1, China's first lunar probe, impacted the moon at 4:13 p.m. Beijing Time (0813 GMT) Sunday, said sources with the State Administration of Science, Technology and Industry for National Defense.







  • NKorea under growing pressure to scrap rocket launch
  • Scientists develop new plasma thruster
  • MIT Rocket Aims For Cheaper Nudges In Space
  • India's Cryogenic Engine Set For Integration With Rocket

  • NASA Kepler Telescope To Launch Aboard Delta II Rocket
  • The Case Of The Fairing That Would Not
  • DPRK Shows Tough Stand On Satellite Launch
  • BrahMos To Sign MOU With ISRO

  • New Launch Date Set For Discovery
  • NASA Defers Setting Next Shuttle Launch Date
  • Shuttle Flight Readiness Review Still On Track For Feb 20
  • NASA again postpones Discovery launch

  • Second ATV Named After Johannes Kepler
  • Russian supply craft arrives at space station: agency
  • Satellite collision poses 'small' risk to ISS: NASA
  • Happy Birthday, Columbus!

  • Oceaneering To Develop And Produce Constellation Space Suit System
  • NASA Tests Parachute For Ares Rocket
  • ISRO Rocket To Carry More Astronauts In Space
  • Statement About NASA Budget Overview For FY2010

  • China's New Geo-Stationary Weather Satellite Finishes Testing
  • New Space Launch Center To Be Built In China's Southernmost Hainan
  • China Plans Space Station With Module Launch In 2010
  • China Plans To Launch Third Ocean Survey Satellite In 2010

  • U.S., Chinese scientists build nanorobot
  • NASA And Caltech Test Steep-Terrain Rover
  • NASA And Caltech Test Steep-Terrain Rover
  • ASI Chaos Small Robot To Participate In Series Of Exercises

  • Gullies On Mars Show Tantalizing Signs Of Recent Water Activity
  • Final European Crewmembers Announced For Human Mars Mission Simulation
  • A Sliver Of A Chance For Life On Mars
  • Europe names crew for Mars 'mission'

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement