SPACE TRAVEL SPACE DAILY SPACE WAR TERRA DAILY MARS DAILY SPACE MART GPS DAILY ENERGY DAILY
  Space Travel News  
Get Our Free Newsletters Via Email
  
Search All Our Sites at SpaceBank
NASA Reinstates Dawn Asteroid Mission

The Dawn of Time
by Staff Writers
Washington DC (SPX) Mar 27, 2006
NASA officials announced Monday that the agency has decided to reinstate the Dawn mission, a robotic exploration of two major asteroids that had been canceled earlier this month because of technical problems and cost overruns.

The new decision arrived in a letter from Rex. D. Geveden, the agency's associate administrator for science missions, to Charles Elachi, director of NASA's Jet Propulsion Laboratory, which was developing Dawn. It followed an appeal of the decision by JPL.

Officials had named the mission Dawn because it was designed to study objects dating from the beginning of the solar system. Its planned trajectory would have taken it to Vesta and Ceres, two of the largest asteroids orbiting the Sun between Mars and Jupiter, including planned orbits of each object via an advanced electric ion-propulsion system.

The mission originally was approved in December 2001 and set for launch this June, but technical problems and other difficulties delayed the projected launch date to July 2007 and pushed its cost from the original estimate of $373 million to $446 million.

NASA Administrator Michael Griffin decided to cancel Dawn on March 2, after about $257 million already had been spent. Officials estimated that about $14 million more needed to be spent to terminate the project.

The reinstatement resulted from a review process established by Griffin and intended to "help ensure open debate and thorough evaluation of major decisions regarding space exploration and agency operations," NASA said in a statement.

"We revisited a number of technical and financial challenges and the work being done to address them," Geveden, who chaired the review panel, said in the same statement. "Our review determined the project team has made substantive progress on many of this mission's technical issues, and, in the end, we have confidence the mission will succeed."

Based on the decision, Geveden's letter ordered JPL to restaff the Dawn project immediately, based on "full funding," and to resume planning operations for the mission.

The letter said Geveden's Science Mission Directorate would develop a detailed replan with JPL, "including an integrated master schedule and updated cost analysis with appropriate confidence factors. JPL will undertake Propulsion Power Unit 500-hour life testing as soon as possible and will report progress and outcomes to SMD within 90 days."

Related Links
DAWN

In Flight Propellant Generation For Advanced Space Transportation
Seattle WA (SPX) Mar 28, 2006
Andrews Space, Inc. (Andrews) was awarded additional Defense Advanced Research Project Agency (DARPA) / Air Force Research Laboratory (AFRL) funding to demonstrate operational capabilities of its Alchemist Air Collection and Enrichment System (ACES). The Alchemist ACES is an in-flight propellant generation system that allows future launch vehicles to take of and land horizontally at conventional airports.

   Add to Delicious





Memory Foam Mattress Review

Newsletters :: SpaceDaily Express :: SpaceWar Express :: TerraDaily Express :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News
  • QinetiQ Returns To Woomera For Hyshot 3 Scramjet Flight Test
  • NASA Opens Web Page For Live And Safe Eclipse Viewing
  • NASA Reinstates Dawn Asteroid Mission
  • In Flight Propellant Generation For Advanced Space Transportation

  • Next Ariane 5 Launch Taking Shape
  • ATK Rocket Motors Power Successful Launch of Pegasus XL
  • NASA Is 'Three For Three' In Successful ST5 Launch
  • Washington Touts US-Russian Satellite Launch Cooperation

  • NASA Puts Off Next Shuttle Launch Until July
  • Shuttle Launch In May Might Be Still On Track
  • QuVIS And Rorke Data System To Support Shuttle Safety
  • NASA Successfully Completes Solid Rocket Motor Test

  • Successful Downlink Communication Test For ATV From ISS
  • Station Crew Repositions Soyuz Craft
  • Space Station Prepares For Arrival Of Brazil's First Astronaut
  • Russia Says Delay In Discovery's Launch Affects ISS Working Plan

  • Headdown Bedrest Precisely Mimics Human Physiology In Spaceflight
  • BAE Systems Radiation Hardened Computers Help NASA Success
  • European Space Camp In The Land Of The Midnight Sun
  • Space Tourism Lures A Rising Number Of US Entrepreneurs

  • Fly Me To A Red Moon
  • China's Big Station Plan
  • The Shenzhou Olympics
  • Nine Satellites Ready For Blast-Off

  • Researchers Get Mammalian Neurons And Silicon Talking
  • Quickplacer, The Fastest Robot In The World
  • iRobot's PackBot On The Front Lines
  • Robots Used To Keep Children Safe In Japan

  • MRO Returns First HiRISE Images of Mars
  • Spirit Churns Up Bright Soil Near McCool
  • Mars Meteorite Similar To Bacteria-Etched Earth Rocks
  • JPL Performs First Two-Antenna Uplink Experiment

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement